Seo, J., Yoo, W.S., Lee, U.K., Kim, C., Kang, K.I. and Cho, H. (2010) Case Study of a Synchronous Hydraulic Jack-Up System for Constructing High-Rise Residential Buildings. Canadian Journal of Civil Engineering, 37, 922- 926. http://dx.doi.org/10.1139/L10-026
被以下文章引用:
-
标题:
桥梁顶升限位防护体系设计与安全性分析Design and Safety Analysis of Block Protection System for Bridge Lifting Construction
作者:
年福龙
关键字:
桥梁顶升, 限位装置, 承载力分析, 桥墩Bridge Lifting, Limiting Protection System, Analysis of Bearing Capacity, Bridge Pier
期刊名称:
《Hans Journal of Civil Engineering》, Vol.5 No.3, 2016-05-20
摘要:
在桥梁墩柱附近设置限位装置是桥梁顶升施工中的重要安全措施之一。然而受桥梁结构和墩柱布置的影响,实际限位装置的设置受到限制。本文结合实际工程顶升施工中的限位防护体系的设计,开展了相应的设计优化,并进行了安全性承载力分析,保证了背景工程的顶升施工安全。
The installation of block protection system near the bridge pier is one of the most important safety precautions in the construction of bridge lifting construction. However, due to the influence of the structure of the bridges and arrangement of the piers, the setting of the protection system is difficult to carry out. In this paper, the optimized design based on the protection system in the lifting construction of the actual project is carried out and the safety bearing capacity is analyzed, which ensured the construction safety of the actual project.