曾勇红, 姜铁兵, 张勇传. 三峡水电站蓄能最大长期优化调度模型及分解算法[J]. 电网技术, 2004, 28(10): 5-8.
ZENG Yonghong, JIANG Tiebing and ZHANG Yongchuan. A long-term scheduling model for stored energy maximization of Three Gorges cascade hydroelectric stations and its decomposition algorithm. Power System Technology, 2004, 28(10): 5-8. (in Chinese)