悬臂现浇预应力混凝土连续梁桥合拢段施工技术与工艺计算Construction Technology and Process Calculation of Closure Section in Cantilever Cast-in-Place Prestressed Concrete Continuous Girder Bridge
张铁志, 郭 超, 尹 咏
土木工程Vol.7 No.4, 全文下载: PDF HTML XML DOI:10.12677/HJCE.2018.74072, July 24 2018
连续梁桥施工监控的MIDAS CIVIL和桥博对比分析Midas Civil and Bridge Dr. Based Comparative Analysis for Continuous Beam Bridge Construction Monitoring
吴亚伟, 彭可可
交通技术Vol.6 No.3, 全文下载: PDF HTML XML DOI:10.12677/OJTT.2017.63012, May 19 2017
大跨径预应力混凝土连续梁桥无缝拓宽影响因素分析Influence Factors Analysis for a Long-Span PC Continuous Girder Bridge Broadened with Seamless Method
刘亮, 顾建明, 李方元
土木工程Vol.5 No.2, 全文下载: PDF HTML XML DOI:10.12677/HJCE.2016.52004, March 9 2016
装配式钢筋混凝土连续梁桥抗震性能分析Seismic Performance Analysis of Prefabricated Reinforced Concrete Continuous Beam Bridges
杨 光, 辛光涛, 陈彦江, 许维炳
土木工程Vol.8 No.3, 全文下载: PDF HTML XML DOI:10.12677/HJCE.2019.83064, May 14 2019
大跨径斜弯连续箱梁桥施工监控研究Study on Construction Monitoring of Long Span Skew Curved Continuous Box Girder Bridge
罗聪辉
交通技术Vol.7 No.3, 全文下载: PDF HTML XML DOI:10.12677/OJTT.2018.73022, May 24 2018
南阁大桥双索面斜拉桥拆除方案及监控方法研究Research on Demolition Scheme and Monitoring Method for Cable-Stayed Bridge with Double Cable Plane of Nange Bridge
佘 阳, 陈 舟, 李丽芬, 朱添丰
土木工程Vol.8 No.1, 全文下载: PDF HTML XML DOI:10.12677/HJCE.2019.81016, January 18 2019