超长混凝土结构温度后浇带合理宽度的研究Research on Rational Width of Post-Casting Temperature Band in Construction of Super-Long Reinforced Concrete Structures
潘立
土木工程Vol.2 No.3, 全文下载: PDF DOI:10.12677/HJCE.2013.23030, July 22 2013
住宅项目沉降后浇带提前封闭的探究与应用Exploration and Application of Early Closure of Post Settlement Pouring Strips in Residential Projects
刘佳航
土木工程Vol.12 No.6, 全文下载: PDF HTML XML DOI:10.12677/HJCE.2023.126092, June 30 2023
浇筑温度和养护凝固方式对水泥混凝土性能的影响Influence of Pouring Temperature and Curing Method on Properties of Cement Concrete
庄 贺, 周杨春
土木工程Vol.10 No.3, 全文下载: PDF HTML XML DOI:10.12677/HJCE.2021.103021, March 17 2021
滑模施工混凝土筒仓结构的缺陷原因分析Defect Causes Analysis for the Reinforced Concrete Silo Formed on Slipforming Construction
潘 立
土木工程Vol.2 No.5, 全文下载: PDF HTML XML DOI:10.12677/HJCE.2013.25044, November 18 2013
磨筋法与钻孔法推算混凝土构件配筋实际应力的比较研究Comparative Study on Abrasion Method & Drilling Method to Estimate Actual Stress of Steel Bars Embedded in Reinforced Concrete Building Members
土木工程Vol.3 No.2, 全文下载: PDF HTML DOI:10.12677/HJCE.2014.32004, March 24 2014
混凝土异形柱代换为矩形柱配筋方法研究Study on Reinforcement Method of Special-Shaped Concrete Columns Replaced by Corresponding Rectangular Columns
土木工程Vol.7 No.5, 全文下载: PDF HTML XML DOI:10.12677/HJCE.2018.75084, September 10 2018