最优控制法对斜拉桥索力的控制机制Optimal Control Method for the Control Mechanism of Cable Force for Cable-Stayed Bridge
王九公, 李树忱
土木工程Vol.10 No.3, 全文下载: PDF HTML XML DOI:10.12677/HJCE.2021.103019, March 9 2021
采用新型临时结构进行斜拉桥换索的可行性分析Feasibility Analysis of Cable Replacement for Cable-Stayed Bridges Using New Temporary Structures
程少南, 高 帅, 卢 凯
土木工程Vol.13 No.10, 全文下载: PDF XML DOI:10.12677/hjce.2024.1310210, October 23 2024
斜拉桥拉索风雨激振研究综述Overview of Research on Wind and Rain Induced Vibration of Cable-Stayed Bridges
张孟乐
土木工程Vol.13 No.7, 全文下载: PDF XML DOI:10.12677/hjce.2024.137142, July 30 2024
异形独塔斜拉桥张拉顺序研究Study on Tensioning Sequence of Cable for Abnormal Single Pylon Cable Stayed Bridge
廖向东, 胡 隽, 罗 宜, 郭福元, 张 杰, 王碧如, 陶群英, 曾 川
土木工程Vol.5 No.5, 全文下载: PDF HTML XML DOI:10.12677/HJCE.2016.55030, September 28 2016
斜拉桥索梁锚固体系研究现状Current Research Status of Cable Beam Anchorage System for Cable-Stayed Bridges
张 驰
土木工程Vol.13 No.8, 全文下载: PDF XML DOI:10.12677/hjce.2024.138150, August 23 2024
某斜拉桥索导管定位测量及计算Cable Duct Location Measurement and Calculation of a Cable-Stayed Bridge
李海泉, 田 晓, 张高峰
土木工程Vol.10 No.4, 全文下载: PDF HTML XML DOI:10.12677/HJCE.2021.104038, April 27 2021