具有非线性安装时间和送出时间的单机排序问题Single-Machine Scheduling Problems with Non-Linear Past-Sequence-Dependent Setup Times and Delivery Times
李明泽
理论数学Vol.7 No.2, 全文下载: PDF HTML XML DOI:10.12677/PM.2017.72009, March 8 2017
具有周期维护的最小化加权总完工时间的平行机调度研究Research on Parallel Machine Scheduling Problem with Periodic Maintenance to Minimize Total Weighted Completion Times
周 菊
运筹与模糊学Vol.11 No.3, 全文下载: PDF HTML XML DOI:10.12677/ORF.2021.113032, July 26 2021
NDP约束下的最小化最大加权完工时间单机一致性在线排序问题研究Online NDP-Constraint Scheduling of Jobs with Agreeable to Minimize the Maximum Weighted Completion Time
李文杰, 杜智慧 科研立项经费支持
理论数学Vol.12 No.4, 全文下载: PDF HTML XML DOI:10.12677/PM.2022.124067, April 21 2022
极大子群的h-完备与群的可解性On h-Completion for Maximal Subgroups and the Solvability of Finite Groups
张晓燕, 徐伟华
理论数学Vol.1 No.2, 全文下载: PDF HTML DOI:10.12677/pm.2011.12025, August 9 2011
基于遗传算法的试验计划总完工时间极小化模型设计与实现Design and Implementation of the Total Completion Time Minimization Model of Test Plan Based on Genetic Algorithm
赵红武, 黄小瑜, 史亚斌, 秦 彪, 王 东, 丁 懿
数据挖掘Vol.6 No.3, 全文下载: PDF HTML XML DOI:10.12677/HJDM.2016.63014, August 24 2016
多目标无等待流水线调度的离散果蝇算法Discrete Fruit Fly Algorithm for Multi-Objective No-Wait Flow Shop Scheduling Problem
潘玉霞, 贾保先 科研立项经费支持
建模与仿真Vol.5 No.2, 全文下载: PDF HTML XML DOI:10.12677/MOS.2016.52002, May 17 2016