基于遗传算法的试验计划总完工时间极小化模型设计与实现Design and Implementation of the Total Completion Time Minimization Model of Test Plan Based on Genetic Algorithm
赵红武, 黄小瑜, 史亚斌, 秦 彪, 王 东, 丁 懿
数据挖掘Vol.6 No.3, 全文下载: PDF HTML XML DOI:10.12677/HJDM.2016.63014, August 24 2016
基于车外压力波动400 km/h高速铁路最不利交会位置和最不利隧道长度The Most Unfavorable Intersection Position and the Most Unfavorable Tunnel of the 400 km/h High-Speed Railway Based on External Pressure Fluctuation
张泽东
力学研究Vol.14 No.1, 全文下载: PDF XML DOI:10.12677/ijm.2025.141006, March 25 2025
浅析如何控制项目投资和提高项目投资完成率Brief Analysis on How to Control the Project Investment and Improve the Completion Rate of Project Investment
冯京莎, 张军宏
石油天然气学报Vol.42 No.4, 全文下载: PDF HTML XML DOI:10.12677/JOGT.2020.424147, December 15 2020
一种新型完井液高温高压静态沉降稳定性评价方法A New Method for Evaluating the Stability of High Temperature and High Pressure Static Settlement of Completion Fluids
杨兰平, 聂强勇, 褚会丽, 杜仕勇, 周芳芳, 徐同台, 涂超凡
石油天然气学报Vol.45 No.4, 全文下载: PDF HTML XML DOI:10.12677/JOGT.2023.454048, December 28 2023
具有周期维护的最小化加权总完工时间的平行机调度研究Research on Parallel Machine Scheduling Problem with Periodic Maintenance to Minimize Total Weighted Completion Times
周 菊
运筹与模糊学Vol.11 No.3, 全文下载: PDF HTML XML DOI:10.12677/ORF.2021.113032, July 26 2021
400 km/h高速铁路隧道初始压缩波产生机理研究Study on Initial Compression Wave Generation Mechanism in 400 km/h High-Speed Railway Tunnel
孙 琦, 张 昭
力学研究Vol.13 No.2, 全文下载: PDF XML DOI:10.12677/ijm.2024.132008, June 26 2024