地铁盾构隧道下穿哈大高铁桥梁段沉降控制分析Settlement Analysis of Metro Shield Tunnel Underpass the Bridge Section of Harbin-Dalian High Speed Railway
刘立明, 张明俭, 李晓鸥
土木工程Vol.10 No.9, 全文下载: PDF HTML XML DOI:10.12677/HJCE.2021.109093, September 13 2021
顶推法架桥阶段桩基对邻近区间隧道影响的三维有限元分析3D-FEM Analysis of Effect of Piers’ Foundation on Adjoining Tunnels during Girder Installation with Incremental Launching Method
汤 平, 秦 渊, 王自民 科研立项经费支持
土木工程Vol.12 No.2, 全文下载: PDF HTML XML DOI:10.12677/HJCE.2023.122009, February 15 2023
基于可拓层次分析法的盾构隧道近接施工风险评估Risk Assessment of Shield Tunnel Close Construction Based on Extension Analytic Hierarchy Process
李 敏, 张学忠
土木工程Vol.12 No.8, 全文下载: PDF HTML XML DOI:10.12677/HJCE.2023.128126, August 25 2023
盾构隧道下穿建筑物变形控制及预测研究Study on Control and Prediction of Building Deformation through Shield Tunnel Crossing Buildings
曹志勇, 张清照, 罗泽军, 李自力, 李五红 科研立项经费支持
土木工程Vol.9 No.10, 全文下载: PDF HTML XML DOI:10.12677/HJCE.2020.910109, October 22 2020
注浆压力不均匀分布影响下过江盾构隧道变形分析Study of the Deformation of Cross-River Shield Tunnel on the Effect of Uneven Distribution of Grouting Pressure
张 健, 刘五一 国家自然科学基金支持
土木工程Vol.7 No.4, 全文下载: PDF HTML XML DOI:10.12677/HJCE.2018.74073, July 26 2018
隧道盾构法施工参数对地表沉降的影响分析Analysis of Shield Tunneling Parameters Influence on Ground Settlement
黄克双 科研立项经费支持
土木工程Vol.10 No.1, 全文下载: PDF HTML XML DOI:10.12677/HJCE.2021.101006, January 28 2021