多目标无等待流水线调度的离散果蝇算法Discrete Fruit Fly Algorithm for Multi-Objective No-Wait Flow Shop Scheduling Problem
潘玉霞, 贾保先 下载量: 1,937 浏览量: 4,557 科研立项经费支持
建模与仿真 Vol.5 No.2, May 17 2016, PDF, , XML DOI:10.12677/MOS.2016.52002 被引量
公共工期指派和可控处理时间资源约束下最大费用最小化单机排序问题Minmax Single Machine Scheduling Problem with Common Due-Date and Controllable Processing Time and Resource Restriction
罗成新 下载量: 699 浏览量: 3,766 国家自然科学基金支持
应用数学进展 Vol.9 No.11, November 18 2020, PDF, HTML, XML DOI:10.12677/AAM.2020.911224 被引量
可变加工时间和维护的松弛交货期与凸资源分配单机排序问题Single Machine Scheduling and Slack Due-Date Assignment and Convex Resource Allocation Problem with Variable Job Processing Time and Maintenance
王亚男, 罗成新 下载量: 1,595 浏览量: 3,211 国家自然科学基金支持
应用数学进展 Vol.7 No.4, April 26 2018, PDF, HTML, XML DOI:10.12677/AAM.2018.74042 被引量
电–氢–交通一体化的综合能源系统调度研究Research on Scheduling Integrated Energy Systems Considering Electricity-Hydrogen-Vehicle Integration
马艳红 下载量: 198 浏览量: 392
电气工程 Vol.11 No.4, December 29 2023, PDF, HTML, XML DOI:10.12677/JEE.2023.114019 被引量
基于改进遗传退火算法的微电网运行优化研究Microgrid Optimization Scheduling Based on Improved Genetic Annealing Algorithm
张 君, 张志飞, 刘珍英, 刘 静 下载量: 747 浏览量: 2,023
电力与能源进展 Vol.8 No.1, February 12 2020, PDF, HTML, XML DOI:10.12677/AEPE.2020.81001 被引量
采煤面隐伏陷落柱三维并行电法探测模拟与应用Detection Simulation and Application of Three Dimensional Parallel Electric Method for Concealed Collapse Column in Coal Face
万之杰 下载量: 325 浏览量: 476
矿山工程 Vol.11 No.1, January 18 2023, PDF, HTML, XML DOI:10.12677/ME.2023.111007 被引量
考虑大用户直购电交易约束的中长期调度计划优化研究与应用Optimization Research and Application of Medium and Long Term Scheduling Scheme Considering the Direct Power Purchase for the Large User Constraints
张慧玲, 李 婷, 毛文照, 郭少青 下载量: 1,899 浏览量: 5,273
智能电网 Vol.6 No.2, April 20 2016, PDF, , XML DOI:10.12677/SG.2016.62012 被引量
基于改进NSGA-III算法的电阻片车间多目标调度模型Research on Flexible Scheduling Problem of Resistor Sheet Processing and Scheduling Based on Multi-Objective Neighborhood NSGA-III Algorithm
姚鑫宇, 向 忠 下载量: 75 浏览量: 198
建模与仿真 Vol.13 No.3, May 10 2024, PDF, HTML, XML DOI:10.12677/mos.2024.133188 被引量
带有退化维修和交货期窗口的加工时间分别可控的单机排序问题Single-Machine Due-Window Assignment and Scheduling with Discretely Controllable Job Processing Times and a Deteriorating Rate-Modifying Activity
张 蕾 下载量: 1,564 浏览量: 3,677
运筹与模糊学 Vol.7 No.1, February 24 2017, PDF, , XML DOI:10.12677/ORF.2017.71001 被引量
考虑联合运行的碳捕集虚拟电厂调度模型Scheduling Model of Carbon Capture Virtual Power Plant Considering Joint Operation
张三杰, 李军祥, 屈德强, 孔得朝 下载量: 241 浏览量: 362 国家自然科学基金支持
建模与仿真 Vol.13 No.1, January 25 2024, PDF, HTML, XML DOI:10.12677/MOS.2024.131063 被引量