基于凝灰岩流变特性的隧道台阶法三维有限元数值模拟和监测反馈分析——以浙江奇坑隧道进口段施工方案比选为例3D-FEM Numerical Simulation and Back Analysis of a Tunnel Excavated with Bench Method Considering Tuff’s Time-Dependency—A Case History: Study on the Intake Section of Qikeng Tunnel in Yuhang County, Zhejiang Province
沈佳锋, 陈英杰, 姚永强, 闵晓阳, 斯纪平, 赖允瑾 下载量: 496 浏览量: 816 科研立项经费支持
土木工程 Vol.10 No.10, October 13 2021, PDF, HTML, XML DOI:10.12677/HJCE.2021.1010110 被引量