周转空间受限的装配式建筑准时(JIT)调度优化Optimization of Just-in-Time (JIT) Scheduling for Prefabricated Buildings with Limited Turnover Space
陈静颖 下载量: 439 浏览量: 1,525
运筹与模糊学 Vol.12 No.1, February 28 2022, PDF, HTML, XML DOI:10.12677/ORF.2022.121013 被引量