风荷载作用下上承式钢管混凝土拱桥施工过程静力性能分析
Analysis of Static Performance in the Construction Process of Concrete Arch Bridge of Upper-Carrying Steel Pipe under the Action of Wind Load
DOI: 10.12677/HJCE.2019.89158, PDF, 下载: 666  浏览: 3,002 
作者: 沙仁智:中铁建大桥工程局集团,第一工程有限公司,辽宁 大连
关键词: 风荷载钢管混凝土有限元静力性能快速施工方式Wind Load Steel Pipe Concrete Finite Element Static Performance Rapid Construction
摘要: 钢管混凝土拱桥作为一个内部高次超静定结构,在施工过程中风荷载必将对结构的内力及位移都产生影响。针对这种影响,本文以找龙坝河特大桥的施工情况为例,基于有限元分析方法,建立三维有限元模型,分析了风荷载下钢管混凝土拱桥的静力性能。结果表明,在采用合龙后拆除吊索且上下拱肋分两次灌浆的快速施工方式时,风荷载下主拱圈的受力及位移是满足安全条件的,在施工监控时应当注意拱脚处受力情况。
Abstract: Steel pipe concrete arch bridge as an internal high-situ super-static structure, the wind load will have an effect on the internal force and displacement of the structure during the construction process. In view of this influence, this paper takes the construction of the Zhaolongba Special Long Span Bridge as an example, based on the finite element analysis method, establishes a three-dimensional finite element model, and analyzes the static performance of the steel pipe concrete arch bridge under the wind load. The results show that when the rapid construction method of removing the sling and two grouting slots is used after the closed, the force and displacement of the main arch ring under the wind load are to meet the safety conditions, and the force conditions at the arch feet should be paid attention to during the construction monitoring.
文章引用:沙仁智. 风荷载作用下上承式钢管混凝土拱桥施工过程静力性能分析[J]. 土木工程, 2019, 8(9): 1355-1361. https://doi.org/10.12677/HJCE.2019.89158

参考文献

[1] 部门中交公路规划设计院. 公路桥梁抗风设计规范[M]. 北京: 人民交通出版社.
[2] JTG D60-2015公路桥涵设计通用规范[S]. 北京: 人民交通出版社, 2015.
[3] 陈宝春. 钢管混凝土拱桥设计[M]. 北京: 中国铁道出版社, 2001.
[4] 陈宝春. 钢管混凝土拱桥施工问题研究[J]. 桥梁建设, 2002(3): 55-59.
[5] 郭聚坤. 大跨度钢管混凝土灌注的仿真模拟分析研究[D]: [硕士学位论文]. 长安大学, 2011.
[6] 陈宝春. 钢管混凝土拱桥发展综述[J]. 桥梁建设, 1997(2): 10-15+24.
[7] 耿悦, 吴欣荣, 王玉银. 施工过程对钢管混凝土桁式拱桥长期静力性能的影响[J]. 建筑结构学报, 2013, 34(S1): 52-58.
[8] 冷捷, 张毅. 关于大跨度钢管混凝土拱桥抗风研究的若干问题[J]. 商丘师范学院学报, 2008, 24(3): 66-69.
[9] 郑景祥. 某钢管混凝土系杆拱桥静动载试验分析[J]. 福建交通科技, 2017(3): 45-47.