矿井工作面采用分装分运系统提高煤质的研究
Research of Mine Working Face by Repackaging Shipment Systems to Improve the Coal Quality
摘要:
本文介绍华晋项目综合部矿井工作面推进时面临超大陷落柱,采用分装分运系统提高煤质的新方法,并分析了之前采用重新送巷缩短工作面长度的方法的局限性,通过分析得知:采用分装分运系统能够高效率的保证原煤质量,并快速通过陷落柱。
Abstract: The paper introduced the new method the General Affairs Department of the Huajin Project used when the mine work faced a large collapse column while the mine working face was advancing. The paper also analyzed the limitations of the former method to re-send the lane to shorten the length of the working face. The simulation results showed that the repackaging shipment system could efficiently ensure the quality of the raw coal and quickly pass through the collapse column.
参考文献
[1]
|
张敬英, 刘碧雁, 董代安 (2001) 山脚树矿井下煤矸分装分运系统的应用. 矿业安全与环保, S1, 134-135.
|
[2]
|
彭敏, 梁宏图 (2013) 煤矿掘进工作面分装分运的改造技术. 河南科技, 19, 32.
|
[3]
|
万彬, 余志勇 (2013) 尚庄煤矿分装分运系统改造. 江西煤炭科技, 1, 68-69.
|
[4]
|
禄祺, 董代安 (2002) 煤矿井下煤矸分装分运系统的应用. 煤矿机械, 1, 43-45.
|
[5]
|
赵彦青, 李冰强, 王小洪 (2003) 东庞矿2~#与9~#煤分装分运系统在生产中的应用. 河北煤炭, 5, 27-28.
|
[6]
|
陈心高, 陶善祥, 王平 (2001) 张庄煤矿实行分装分运集中选煤的实践. 选煤技术, 5, 41-42.
|