利用帷幕注浆技术治理煤矿灰岩突水问题研究
Water Inrush Problem Research of Using the Heavy Curtain Grouting Technology to Govern Limestone in Coal Mine
DOI: 10.12677/ME.2016.41001, PDF, HTML, XML, 下载: 1,832  浏览: 4,651 
作者: 池文程*:福建省永安煤业有限责任公司,福建 三明
关键词: 突水治理帷幕注浆资源储量Water Inrush Control The Curtain Grouting Resources Reserves
摘要:

本文通过介绍福建省仙亭煤矿通过实施帷幕注浆堵水治理煤矿灰岩水的成功经验,为广大煤矿水文地质工作者提供一种治理煤矿突水的方法。

By introducing the successful experience that the fairy pavilion coal mine in Fujian Province uses heavy curtain grouting technology to govern limestone in coal mine, this paper provides a method to manage the coal mine water inrush for the majority of coal mine hydrogeology workers.

文章引用:池文程. 利用帷幕注浆技术治理煤矿灰岩突水问题研究[J]. 矿山工程, 2016, 4(1): 1-6. http://dx.doi.org/10.12677/ME.2016.41001