[1]
|
何旭红, 黄祥瑞. 工业系统中人的可靠性分析: 原理、方法与应用[M]. 北京: 清华大学出版社, 2007.
|
[2]
|
Betul, Y. and Mutlu, Y.M. (2010) A Multi-Objective Ant Colony System Algorithm for Flow Shop Scheduling Problem. Expert Systems with Applications, 37, 1361-1368. https://doi.org/10.1016/j.eswa.2009.06.105
|
[3]
|
Mahdi, N. and Nasim, N. (2013) An Interactive Algorithm for Multi-Objective Flow Shop Scheduling with Fuzzy Processing Time through Resolution Method and TOPSIS. International Journal of Advanced Manufacturing Technology, 66, 1047-1064. https://doi.org/10.1007/s00170-012-4388-5
|
[4]
|
Voratas, K. and Siriwan, S. (2011) A Two-Stage Genetic Algorithm for Multi-Objective Job Shop Scheduling Problems. Journal of Intelligent Manufacturing, 22, 355-365. https://doi.org/10.1007/s10845-009-0294-6
|
[5]
|
李兢尧, 孙树栋, 黄媛, 牛刚刚. 求解双资源约束车间调度问题的继承式双目标遗传算法[J]. 控制与决策, 2011, 26(12): 1761-1767.
|
[6]
|
Xu, J., Xu, X. and Xie, S.Q. (2011) Recent Devel-opments in Dual Resource Constrained (DRC) System Research. European Journal of Operational Research, 215, 309-318. https://doi.org/10.1016/j.ejor.2011.03.004
|
[7]
|
方叶祥, 钱存华, 蒋南云, 郑宝龙, 崔志勇. 基于遗传禁忌算法的双资源约束下并行生产线调度研究[J]. 运筹与管理, 2007, 16(5): 153-158.
|
[8]
|
鞠全勇, 朱剑英. 双资源多工艺路线作业车间模糊调度问题研究[J]. 机械科学与技术, 2006, 25(12): 1424-1427.
|
[9]
|
Zamiska, J.R., Jaber, M.Y. and Kher, H.V. (2007) Worker Deployment in Dual Resource Constrained Systems with a Task-Type Factor. European Journal of Operational Research, 177, 1507-1519.
https://doi.org/10.1016/j.ejor.2005.04.018
|
[10]
|
刘晓霞, 蔡刚毅, 谢里阳. 双资源作业车间双目标调度优化研究[J]. 组合机床与自动化加工技术, 2009(10): 107-112.
|
[11]
|
Kher, H.V. (2000) Examination of Flexibility Acquisition Policies in Dual Resource Constrained Job Shops with Simultaneous Worker Learning and Forgetting Effects. Journal of the Operational Research Society, 51, 592-601.
https://doi.org/10.1057/palgrave.jors.2600935
|
[12]
|
Salum, L. and Araz, O.U. (2009) Using the When/Where Rules in Dual Re-source Constrained Systems for a Hybrid Push-Pull Control. International Journal of Production Research, 47, 1661-1677.
https://doi.org/10.1080/00207540701579530
|
[13]
|
Bokhorst, J.A.C., Slomp, J. and Gaalman, G.J.C. (2004) On the Who-Rule in Dual Resource Constrained (DRC) Manufacturing Systems. International Journal of Production Research, 42, 5049-5074.
https://doi.org/10.1080/00207540410001733878
|
[14]
|
Bernd, S.R., Jens, H. and Torsten, H. (2010) Analysis of Priority Rule-Based Scheduling in Dual-Resource-Con- strained Shop-Floor Scenarios. International Conference on Advances in Machine Learning and Systems Engineering, Springer Verlag, Berkeley, 269-281.
|
[15]
|
Elmaraghy, H., Patel, V. and Abdallah, I.B. (2000) Scheduling of Manufacturing Systems under Dual-Resource Constraints Using Genetic Algorithms. Journal of Manufacturing Systems, 19, 186-198.
https://doi.org/10.1016/S0278-6125(00)80011-4
|
[16]
|
Li, J.Y., Sun, S.D., Huang, Y. and Wang, N. (2011) Solving Dual Re-source Constrained Job-Shop Scheduling Problem (DRCJSP) Based on Hybrid Ant Colony Algorithm with Self-Adaptive Parameters. Journal of Northwestern Polytechnical University, 29, 54-61.
|
[17]
|
袁亮, 袁逸萍, 袁志玲, 孙文磊. 双资源柔性车间多目标调度优化研究[J]. 组合机床与自动化加工技术, 2013(12): 149-152.
|
[18]
|
EI Marghy, H. (1999) A Genetic Algorithm Based Approach for Scheduling of DRC-Resource Constrained Manufacturing Systems. Annals of the CIRP, 369-372.
|
[19]
|
孙志峻. 双资源车间智能优化调度[J]. 东南大学学报, 2005, 35(3): 376-381.
|
[20]
|
Kumar, M. and Rajotia, S. (2003) Integration of Scheduling with Computer Aided Process Planning. Journal of Materials Processing Technology, 138, 297-300. https://doi.org/10.1016/S0924-0136(03)00088-8
|
[21]
|
Chryssolouris, G., Chan, S. and Cobb, W. (1984) Decision Making on the Factory Floor: An Integrated Approach to Process Planning and Scheduling. Robotics and Computer-Integrated Manufacturing, 1, 9-315.
https://doi.org/10.1016/0736-5845(84)90020-6
|
[22]
|
Bao, Z.Q., Ding, Q.X., Zhu, J.W., Wang, C. and Wang, F.F. (2012) Mul-ti-Objective Integrated Manufacturing Collaborative Planning and Scheduling Based on Pareto Optimal. Computer Integrated Manu-facturing Systems, 18, 2419- 2426.
|
[23]
|
Jbid, A. (2013) An Integrated Fuzzy Approach for Information Technology Planning in Col-laborative Product Development. 7th IFAC Conference on Manufacturing Modelling Management and Control, 1985-1990.
|
[24]
|
Zhou, H., Wang, J. and Tan, X.W. (2007) Hybrid Collaborative Evolutionary Algorithm for Integrated Production Planning. Computer Inte-grated Manufacturing Systems, 13, 1412-1418.
|
[25]
|
吴秀丽, 孙树栋, 杨展, 翟颖妮. 多目标柔性Job Shop调度问题的技术现状和发展趋势[J]. 计算机应用研究, 2007, 24(3): 1-9.
|
[26]
|
Chryssolouris, G., Chan, S. and Cobb, W. (1984) Decision Making on the factory Floor: An Integrated Approach to Process Planning and Scheduling. Robotics and Computer-Integrated Manufacturing, 1, 9-315.
https://doi.org/10.1016/0736-5845(84)90020-6
|
[27]
|
Bao, Z.Q., Ding, Q.X., Zhu, J.W., Wang, C. and Wang, F.F. (2012) Mul-ti-Objective Integrated Manufacturing Collaborative Planning and Scheduling Based on Pareto Optimal. Computer Integrated Manu-facturing Systems, 18, 2419- 2426.
|
[28]
|
Jbid, A. (2013) An Integrated Fuzzy Approach for Information Technology Planning in Col-laborative Product Development. 7th IFAC Conference on Manufacturing Modelling Management and Control, 1985-1990.
|
[29]
|
Zhou, H., Wang, J. and Tan, X.W. (2007) Hybrid Collaborative Evolutionary Algorithm for Integrated Production Planning. Computer Inte-grated Manufacturing Systems, 13, 1412-1418.
|
[30]
|
Beckendorff, U., Kreutzfeldt, J. and Ullmann, W. (1991) Reactive Workshop Scheduling Based on Alternative Routings. Proceedings of a Conference on Factory Automation and Information Management, Boca Roton, CRC Press, 75- 85.
|
[31]
|
Kumar, P.R., Ajai, J. and Rajiv, V. (2013) An Approach for Integration of Process Planning and Scheduling. International Journal of Computer Integrated Manufacturing, 26, 284-302. https://doi.org/10.1080/0951192X.2012.684721
|
[32]
|
郑金华. 多目标进化算法及其应用[M]. 北京: 科学出版社, 2007: 51-60.
|